CV Link Guide: Map, Open Segments & Construction Updates
Choose a CV Link segment, find access points and check construction notices, with maps, pathway rules and Mark Miller’s original photographs.
CV Link is open, but it is not one uninterrupted 40-mile trail across the Coachella Valley. The system currently consists of three principal open segments in the west, central and east Valley, with gaps through Rancho Mirage and Indian Wells and additional connections still being planned.
This living guide explains where the open sections begin and end, what is allowed on the pathway, where major closures are expected, and which future extensions are moving through planning. The map and tracker will be updated as official schedules change and as Desert Oasis Insider verifies conditions in the field.
- Current system: CVAG describes CV Link as an approximately 40-mile shared-use pathway divided into three open Valley segments.
- Open mileage: West Valley 19.63 miles, Central Valley 5.44 miles and East Valley 16.02 miles.
- Not continuous: the approved mainline does not run through Rancho Mirage or Indian Wells.
- Allowed users: pedestrians, bicycles, e-bikes, electric scooters and qualifying low-speed electric vehicles, including golf carts.
- What is changing: three major bridge or interchange projects are expected to affect the route between 2026 and 2029, while connectors and longer extensions remain in development.
Plan your CV Link visit
Choose one part of the Valley, find your access point, then check the latest path notices. The segment mileages below describe the network, not a recommended outing distance.
Palm Springs & Cathedral City
Palm Springs Visitor Center to Date Palm Drive
Includes the South Palm Springs branch and on-street portions.
Before you go: review the planned Ramon Road closure.
See Mark’s photographed entrance Ramon Road noticePalm Desert
Bump & Grind access to Cook Street
Combines on-street sections with the Whitewater River corridor.
Listed nearby facilities: Bump & Grind access area and Civic Center Park.
Explore Bump & Grind Explore Civic Center ParkLa Quinta, Indio & Coachella
Washington Street to Airport Boulevard
Officially listed facilities include North Jackson Park and Sierra Vista Park.
Before you go: check Avenue 50 path access and the future Monroe Street work.
Avenue 50 notice Monroe Street noticePlan an out-and-back? Allow for the return distance. Check access and park hours before relying on parking, restrooms or water; named facilities are not a promise that every service is available.
Sources checked October 19, 2026. Construction notices describe planned impacts; active closure conditions and signed detours at Avenue 50 and Ramon Road remain unverified.
Mark’s latest field visit: September 9, 2026. See the Palm Springs entrance photographs.
CV Link map: what is open, interrupted and still planned
The first map is a Desert Oasis Insider status schematic—not a navigation map. It is designed to make the three open sections, two main city gaps, announced disruption points and future directions understandable at a glance.
CV Link status at a glance
Select a layer to isolate the open route, announced disruption points or future projects.
Official interactive route map
Use the official CV Link map below for the detailed alignment, access points, construction zones and posted detours. Open the map full screen when navigating; the schematic above is for project understanding only.
Palm Springs CV Link entrance: how to find it
I visited this Palm Springs access point on September 9 and photographed the entrance pavilion, pathway and CV Link marker below. One useful discovery: searching Google for CV Link sent me to a different nearby location. For the entrance shown here, use the street approach from North Gene Autry Trail onto East Via Escuela, near the bend into Executive Drive.
Start with these streets
- From North Gene Autry Trail, turn east onto East Via Escuela.
- Continue toward the bend where the road becomes Executive Drive.
- Look for the CV Link pavilion and entrance marker shown in the photos, then follow the signed path connection.
Google Maps tip: use the named streets to locate this access area. A general “CV Link” search may select a different nearby point.
Open the street approach in MapsWhat the entrance looks like
The photos show a shade pavilion with seating and bike racks, a paved path with orange and blue accents, and CV Link entrance signage. Select any photo to view it full screen. Use the arrows or swipe to browse the gallery.
All three photographs © Mark Miller / Desert Oasis Insider · September 9, 2026.
Before you go: this visit documents one access point. Designated public parking, restroom access and working drinking water were not confirmed here. Follow posted parking restrictions and current path signs when you arrive.
The three open CV Link segments
Palm Springs to Cathedral City
The longest open segment begins at the Palm Springs Visitor Center, follows the Chino Wash and Whitewater River corridor, and ends at Date Palm Drive in Cathedral City. It also includes the South Palm Springs branch along Tahquitz Creek and on-street portions.
Useful context: the Visitor Center and Esperanza Park are among the official locations with nearby restroom facilities.
Palm Desert
This segment begins near the Bump & Grind trailhead and continues through Palm Desert to Cook Street beside Palm Desert High School. It includes both on-street and Whitewater River portions.
Useful context: the Bump & Grind access area and Palm Desert Civic Center Park are listed as restroom locations along the network.
La Quinta through Indio to Coachella
The eastern segment begins at Washington Street in La Quinta and runs through Indio to Airport Boulevard in Coachella. North Jackson Park in Indio and Sierra Vista Park in Coachella are among the official restroom locations associated with the route.
This is also where the planned Arts and Music Line, the future Mecca/North Shore study and two of the three announced 2026–2029 disruption points become most relevant.
Why the mileage appears inconsistent: CVAG describes CV Link as a 40-mile system, but its published segment figures total 41.09 miles. The most reasonable reading is that “40 miles” is the rounded project description while the segment figures are more precise. This guide preserves both figures instead of silently changing either one.
Is CV Link continuous across the Valley?
No. The three principal open segments are separated. The approved CV Link mainline does not include a route through Rancho Mirage or Indian Wells, leaving the largest central gaps between Cathedral City, Palm Desert and La Quinta.
That does not mean all active-transportation planning stops at those city boundaries. The separate Community Connectors project has coordinated with Rancho Mirage and Indian Wells on potential cycling and pedestrian connections using surface streets. Those connections are not a revival of the CV Link mainline through either city, and they should not be shown as built until a final route, funding and construction are established.
Navigation warning: do not assume that the dashed gaps on the schematic are safe or signed connector routes. Plan each open segment as its own outing unless the official map and current local conditions confirm a usable connection.
CV Link rules, hours and amenities
Who can use it?
Pedestrians, bicycles, e-bikes, electric scooters and low-speed electric vehicles—including golf carts—are permitted. Gas-powered automobiles, minibikes, dirt bikes and off-road vehicles are not.
How fast can you travel?
The CV Link maximum is 20 mph. Electric scooters and boards have a 15 mph limit. Stay right, pass carefully and slow down around other users.
When is it open?
CVAG currently lists no posted hours of operation. Solar-powered lighting is incorporated into the path and access points, but users should still bring appropriate lights and visibility equipment after dark.
Are golf carts street legal?
Permission to use CV Link does not erase California Vehicle Code or individual city requirements encountered before reaching the path. Licensing, insurance, registration and street-use rules depend on the vehicle and route.
What amenities are available?
The project identifies shade structures, water stations, benches, bike racks, wayfinding signs and solar lighting. Restrooms are available at several parks and access points rather than continuously along the route.
What do the colors mean?
Official orange wayfinding points toward the San Jacinto Mountains; blue points toward the Salton Sea. Colored glass and lighting reinforce that directional system.
Desert conditions matter. Long exposed portions of CV Link can become dangerous during extreme heat. Check the forecast, carry more water than you expect to need, choose turnaround points before starting and avoid treating shade or working fountains as guaranteed.
Funded shade improvements at five rest stops
The Coachella Valley Mountains Conservancy approved a $1,248,586 Proposition 4 grant to CVAG on August 10, 2026, according to September 1 reporting by Patch. The project adds shade structures and approximately 26 native shade trees at five rest stops in Palm Springs, Palm Desert and Coachella. City News Service also reported the award and an expected completion by 2028.
This is a funded improvement to existing CV Link access areas, not a new route segment. DOI has not independently verified installation or completion at the individual stops. The planned shade should therefore not be counted as available shelter when arranging an outing.
Separate city planning: The Palm Springs Post's September 13 meeting preview also identifies a citywide shade-and-heat plan update at the September 14 Active Transportation Subcommittee meeting. That broader planning discussion is separate from this regional grant; it does not establish that additional CV Link work has been approved.
Adams Street cable-railing project
Railing planned; installation start unverified
For your trip: the contract specifications allow partial-width closures while crews work, but require the path to remain open and return to full width outside work hours. This describes the work rules, not a confirmed active work zone.
Procurement page checked October 19, 2026 · No posted bid result, award or notice to proceed was located.
Bid history & project details
October 16 source check: the October 15, 2026, 1 p.m. bid deadline has passed. CVAG’s procurement page still lists the invitation and addenda, including October 5 Addendum No. 3. This review did not locate a posted bid result, contract award or notice to proceed. The elapsed deadline does not establish that a bid was accepted or installation began.
The bid documents call for approximately 450 linear feet of cable railing at the Adams Street undercrossing, identified as the highest-priority location after user feedback about portions of the pathway beside channel slopes. The initial work is due within 60 calendar days after a future notice to proceed; the documents do not establish that such notice has been issued.
CVAG’s specifications say the path may have partial-width closures during work hours but may not be fully closed, and it must reopen to full width outside work hours. Up to 1,000 additional linear feet at other locations may be authorized later through separate task orders.
Construction closures and detour tracker
Official notices checked October 19, 2026 · A planned closure is not confirmation that barriers are in place today.
Ramon Road Bridge
- What is happening
- The bridge project requires the CV Link undercrossing to close and be removed during reconstruction.
- For your trip
- Check the official map and posted signs before planning a through-route at Ramon Road. A usable detour has not been verified.
- Still unconfirmed
- An active path closure, final detour, contract award and notice to proceed.
Schedule, sources & project details
City schedule: construction was announced for fall 2026, with completion anticipated in December 2028.
The bridge over the Whitewater Channel is scheduled to be widened. At the October 5 Active Transportation Subcommittee meeting, Palm Springs engineering staff said the CV Link undercrossing must close and be removed during the approximately two-year project because the work reaches across the channel and includes deep scour protection.
Detour: An alternate route has not been finalized. The reported preferred Sarah Street option would require private-property access in Cathedral City, and the city/CVAG coordination remains unresolved. No unconfirmed bypass has been drawn on DOI’s map.
What is not confirmed: The October 6 report said bids would open October 8 and staff hoped to bring an award to City Council in late October or November. DOI has not verified an award, notice to proceed, active path closure or posted detour.
Read the City of Palm Springs project notice Read the October 6 meeting report
Avenue 50 Bridge
- What is happening
- A groundbreaking was reported October 15. CVAG anticipates a path closure during bridge construction.
- For your trip
- The vehicle crossing is intended to remain open. That does not establish access along CV Link; check path signs before continuing.
- Still unconfirmed
- Whether the path closure has begun, the signed detour and the exact work-start date.
Schedule, sources & project details
October 15, 2026 milestone: Coachella held a groundbreaking ceremony at Sierra Vista Park, according to KESQ’s on-site reporting and City News Service / MyNewsLA. This supersedes the earlier “bids closed” checkpoint; it is a reported ceremony, not a DOI field inspection.
Purpose and timing: The bridge will replace the low-water crossing over the stormwater channel, with related Avenue 50 and Tyler Street improvements. Officials described an approximately two-year construction period. That is a forecast, not a confirmed completion date.
Road access is not trail access: KESQ reports that the existing vehicle crossing is intended to remain open during construction. This does not confirm that the CV Link pathway remains open or establish a usable trail detour.
CV Link access still needs verification: CVAG’s construction notice anticipates a path closure and posted detour but still carries its older August 2026–2028 window. DOI has not verified an active path closure, detour alignment, notice to proceed or exact field start. No unconfirmed bypass has been drawn on the map.
I-10 / Monroe Street Interchange
- What is happening
- CVAG’s published window is January 2027–2029 for the interchange project.
- For your trip
- CV Link beneath Monroe Street is expected to close during the work, with a posted detour.
- Still unconfirmed
- The eventual path closure date and usable detour alignment.
Schedule, sources & project details
Expected: January 2027 through 2029.
The interchange upgrade is expected to close CV Link beneath Monroe Street for the duration of the project. A detour is expected to be posted around the construction zone.
For current access questions: CV Link project hotline 833-428-5465 or info@coachellavalleylink.com. Follow the signs and barriers at the path.
Future CV Link projects and extensions
Main system officially opened
CVAG celebrated the opening of the approximately 40-mile system after substantial completion in June 2025.
Community Connectors narrow toward priorities
The regional connector study moved from a Top 15 set in January 2026 toward final priority connections. The plan is intended to guide future funding and design; it is not a construction schedule.
Desert Hot Springs alternatives
CVAG authorized an alternatives analysis and conceptual plan in September 2025. At least five route alternatives were being analyzed, with the analysis expected to wrap in 2026.
Arts and Music Line
CVAG anticipates beginning construction on this community connector along Avenue 48 and Dillon Road through La Quinta, Indio and Coachella. “Anticipated” is not the same as a guaranteed groundbreaking.
Mecca and North Shore extension
A separate study is examining a longer mainline extension toward Mecca, North Shore and the Salton Sea, with outreach and alignment work still underway.
What Community Connectors would change
The connector program is meant to make CV Link useful beyond the main pathway. Its planning goals include safer walking and biking routes between neighborhoods, schools, parks, community centers, businesses and the main CV Link spine. That makes it potentially more important to everyday residents than simply adding recreational mileage.
However, the connector plan should remain in the “planning” layer of this tracker until specific alignments, funding, environmental work and construction schedules are adopted. A line appearing in a workshop does not mean the route has been approved or funded.
How to plan your first CV Link outing
Choose one segment
Do not begin by planning a full Valley crossing. Select the West, Central or East segment based on the access point, mileage and nearby facilities that work for you.
Check construction
Review the official map and construction page on the day of the outing, especially near Ramon Road, Monroe Street and Avenue 50.
Set a turnaround point
The published mileage is segment length, not necessarily the distance you should travel. Remember that an out-and-back doubles the distance and water requirement.
Navigate by landmarks
Note the nearest major street, city boundary and mile marker. Use orange toward the San Jacinto Mountains and blue toward the Salton Sea as a secondary orientation aid.
What Desert Oasis Insider will verify next
The September 9 Palm Springs visit adds a photographed entrance and a clearer street approach. The next field checks will extend that coverage to more access points, parking, amenities and detours.
Real access points
Where a first-time user can confidently enter the path, park legally and recognize the correct direction.
Detour conditions
Whether announced bridge and interchange closures have actually begun and how the posted bypass works.
Amenities in practice
Restrooms, drinking water, shade, seating and bike support at useful intervals—not simply whether they exist somewhere on the system.
Segment character
Which sections are best for a short walk, a family ride, a longer workout, desert views or low-speed electric travel.
Crossing safety
Locations where users leave the protected path, cross higher-speed streets or encounter confusing wayfinding.
Repeat photography
Dated images from the same disruption and future-project locations so visible change can be separated from announced schedules.
CV Link update log
October 18, 2026 — Avenue 50 groundbreaking reported
Added the October 15 ceremony using KESQ’s on-site reporting and City News Service / MyNewsLA. Separated the approximately two-year construction forecast and the plan to retain the existing vehicle crossing from the unresolved CV Link path closure and detour. The earlier November 3 third-party projection is no longer presented as the next project milestone. CVAG’s procurement page still did not establish an Adams Street bid result, award or notice to proceed. Mark’s September 9 Palm Springs photographs remain the latest field visit.
October 19, 2026 — Visit planner and clearer path notices
Added three segment choices with access resources, simplified construction cards around trip impacts, and moved detailed project history into expandable sections. Rechecked the official route, construction and procurement pages; current path access and signed detours remain unverified. Updated related places while retaining the September 9 field photographs.
October 16, 2026 — Adams Street deadline passed; result unverified
CVAG’s procurement page and October 5 Addendum No. 3 still identify October 15 at 1 p.m. as the bid deadline. This review did not locate a posted bid result, award or notice to proceed. The next documentary checkpoints are the procurement result and authorization to begin work. The official construction-update page still describes future bridge disruptions; it does not establish an active Ramon Road closure. September 9 remains DOI’s latest field visit.
October 12, 2026 — Ramon Road undercrossing closure confirmed in planning
- Replaced the unverified September meeting preview with the October 5 meeting outcome: engineering staff said the path must close and be removed during the bridge reconstruction.
- Recorded the City’s December 2028 completion target and kept the construction start, contract award and active closure unconfirmed.
- Marked the detour as unresolved; no street-by-street bypass has been added to DOI’s map.
This is a research update only. Mark Miller’s September 9 Palm Springs photographs remain the latest field record in this guide.
October 10, 2026 — Adams Street cable-railing bid opening moved
- Added CVAG’s October 5 addendum extending the public bid opening to October 15 at 1 p.m.
- Recorded the approximately 450-foot Adams Street undercrossing scope and separated the bid milestone from any future award, notice to proceed or construction start.
- Added the operating constraint: partial-width closures may occur during work hours, but CV Link may not fully close and must reopen to full width outside work hours.
This is a research update only. Mark Miller’s September 9 Palm Springs photographs remain the latest field record in this guide.
September 18, 2026 — Avenue 50 bidding closed; construction start unconfirmed
- Recorded the City of Coachella's September 3 bid deadline and closed solicitation status separately from a contract award or work-start confirmation.
- Added an explicitly attributed November start projection from ConstructConnect. Retained CVAG's earlier published window as a schedule, not evidence that construction has begun.
- Expanded the Avenue 50 project scope and kept the route map free of an unverified detour alignment.
This is a research update only. Mark's September 9 Palm Springs photographs and entrance observations remain the latest on-site record in this guide.
September 13, 2026 — Shade funding added; bridge notices rechecked
- Added the previously announced August 10 shade-grant award, its five-stop scope and projected 2028 completion. Installation remains unverified.
- Rechecked CVAG's three construction notices. Their date windows remain unchanged; the Ramon Road notice does not establish an active closure or a street-by-street detour.
- Recorded the September 14 Palm Springs bridge/detour discussion as a future checkpoint, not an outcome. Kept the citywide heat-planning discussion separate from the regional shade grant.
This is a research update, not a new field visit. The September 9 photographs and entrance observations remain the latest on-site record.
September 9, 2026 — Palm Springs entrance photographed
- Added three original photographs from Mark Miller’s Palm Springs field visit, with full-screen viewing.
- Documented the approach from North Gene Autry Trail onto East Via Escuela near Executive Drive.
- Added a street diagram and a note that a general Google search can point visitors to a different nearby location.
September 7, 2026 — Desert Oasis Insider tracker launched
- Documented the three official open-segment lengths and endpoints.
- Mapped the Rancho Mirage and Indian Wells mainline gaps.
- Added the Ramon Road, Monroe Street and Avenue 50 disruption schedules.
- Separated the anticipated Arts and Music Line from connector planning and longer extension studies.
- Established the field-verification list for access, amenities, crossings and detours.
November 2025 — CV Link grand-opening celebrations
CVAG officially opened the approximately 40-mile system after reporting substantial completion in June 2025.
September 2025 — Desert Hot Springs study authorized
CVAG authorized up to $130,000 for alternative-route analysis and a conceptual plan to support future engineering, design and funding applications.
Explore the wider Coachella Valley
Use the Atlas to move from CV Link into the parks, communities, trailheads, cities and stories surrounding the route.
Explore the Coachella Valley AtlasFrequently asked questions
What is CV Link?
CV Link is an approximately 40-mile shared-use transportation and recreation pathway across portions of the Coachella Valley. It is designed for pedestrians, bicycles and permitted low-speed electric vehicles and runs largely beside the Whitewater River and stormwater channel.
Can you travel continuously from Palm Springs to Coachella on CV Link?
No. CVAG currently identifies three principal open segments: West Valley, Central Valley and East Valley. The approved mainline does not include Rancho Mirage or Indian Wells, so users should not interpret the system’s total mileage as one uninterrupted off-street route.
Are golf carts allowed on CV Link?
Yes, qualifying low-speed electric vehicles and golf carts are allowed on CV Link with a 20 mph maximum. Operators must also follow California Vehicle Code and local city rules when traveling on public streets to reach or leave the pathway.
Is CV Link open at night?
CVAG currently reports no posted hours of operation. The system includes solar-powered lighting at pathway and access locations, but cyclists and low-speed vehicles should still meet applicable nighttime lighting and visibility requirements.
Where are bathrooms available along CV Link?
CVAG lists restrooms at or near the Palm Springs Visitor Center, Esperanza Park, the Bump & Grind access point, Palm Desert Civic Center Park, North Jackson Park and Sierra Vista Park. Availability can change, so confirm park hours and conditions before relying on a particular location.
Sources and editorial information
October 19 access-source check: Rechecked CVAG’s official route map, construction notices and procurement page. The construction notices still describe anticipated path closures; they do not establish a field-verified closure or signed detour today. The procurement page still lists the October 15 cable-railing bid opening without a posted result located in this check.
October 18 research scope: Read KESQ’s October 15 on-site groundbreaking report and City News Service / MyNewsLA’s October 15 ceremony report, plus CVAG’s construction and procurement pages. Coachella’s own website and full September 21 meeting recording could not be retrieved in this check; the exact contract, notice to proceed and actual path access are not independently verified here.
- KESQ, October 15, 2026: Avenue 50 ceremony, approximately two-year construction forecast and vehicle-crossing plan
- City News Service / MyNewsLA, October 15, 2026: ceremony at Sierra Vista Park
This article prioritizes CVAG and the official CV Link project for route status, rules and project schedules. Desert Oasis Insider labels expected dates as schedules rather than completed events and records field observations separately. The September 9, 2026 Palm Springs entrance directions draw on Mark Miller’s visit and location screenshot; all three accompanying photographs are his original work.
October 16 research scope: CVAG’s procurement page, October 5 Addendum No. 3 and the official construction-update page were reviewed. No Adams Street bid result, award or notice to proceed was located in those materials. This is a source check, not a new field visit or confirmation of actual path access.
October 12 research scope: The City of Palm Springs’ June 11 project notice and The Palm Springs Post’s October 6 report from the October 5 public meeting were checked directly. The City establishes the announced fall 2026 start window and December 2028 completion target; the meeting report establishes staff’s full-closure/removal statement and the unresolved detour. DOI has not verified a construction contract award, notice to proceed, active closure or posted detour.
October 10 research scope: CVAG’s current procurement page, the cable-railing invitation for bids and the October 5 addendum were checked directly. The October 15 bid opening, Adams Street scope and operating constraints are official procurement details. DOI has not verified a contract award, notice to proceed, installation or active partial-width closure.
September 18 research scope: The City of Coachella's bid list and CVAG's construction notice were checked directly. ConstructConnect is a secondary source for the provisional start date and expanded project scope. DOI has not independently confirmed a contract award, notice to proceed, field commencement or active detour. CVAG's older date window is retained transparently rather than presented as an actual construction start.
September 13 research scope: CVAG's construction page was rechecked directly. Shade-award details are attributed to September 1 reporting by Patch and City News Service; DOI did not independently inspect the grant agreement. The city's calendar confirms the September 14 meeting, while the listed bridge/detour and heat-planning topics are attributed to The Palm Springs Post's September 13 preview. No meeting outcome, approved detour alignment or new construction start is claimed.
- City of Palm Springs, June 11, 2026: Ramon Road Bridge schedule, scope and December 2028 completion target
- The Palm Springs Post, October 6, 2026: October 5 meeting outcome, full CV Link closure and unresolved detour
- CVAG proposals page: current cable-railing bid schedule and addenda, checked October 10, 2026
- CVAG Addendum No. 2, October 5, 2026: bid opening extended to October 15
- City of Coachella bid list: Avenue 50 Bridge deadline and closed status, checked September 18, 2026
- ConstructConnect: Avenue 50 post-bid listing, provisional schedule and scope; checked September 18, 2026
- Official CV Link overview and open-segment descriptions
- Official interactive map, rules and amenities
- Official construction closure and detour schedules
- Official CV Link operating FAQs
- CVAG account of the Desert Hot Springs, Rancho Mirage and Indian Wells gaps
- CV Link Community Connectors planning page
- Official printable route overview and safety guide
- Patch, September 1, 2026: grant approval, five rest stops and approximately 26 trees
- City News Service / KESQ, September 1, 2026: shade funding and projected completion
- City of Palm Springs: September 14, 2026 Active Transportation Subcommittee meeting
- The Palm Springs Post, September 13, 2026: bridge/detour and shade-planning agenda preview