I have attended several lectures about the Salton Sea. One idea stayed with me: bring water north from Mexico, cover the exposed lakebed and stop the dust. Lithium development was another possibility that caught my attention.
Both deserve a closer look. But “solve the Salton Sea” can mean several different things, and an appealing proposal is not the same as an approved, funded project. This guide compares the major documented approaches, the problem each targets and the evidence still needed.
- Different proposals solve different problems: water level, salinity, dust, habitat, polluted inflow and funding.
- Mexico water imports have been seriously studied, but the 2022 independent panel did not recommend proceeding with the submitted concepts.
- Lithium could contribute revenue; extracting it from deep brine does not itself refill or desalinate the lake.
- Compare 12 approaches and supporting measures below, with named participants, tradeoffs and dated evidence.
One lake, several different problems
Water volume, salt concentration, exposed dust-producing ground, habitat, polluted inflow and long-term funding are connected, but they are not interchangeable. A project can improve one while leaving another largely unchanged. The State Water Board’s overview explains the links between reduced inflow, concentrated salts and nutrients, habitat stress and exposed lakebed. [1]
A useful first question is therefore: What result are we trying to buy? Water at an old boat ramp? Lower salinity? Less airborne dust from a specific source? Dependable bird habitat? A funded maintenance program? The answer changes which proposal makes sense.
Compare the approaches
The benefits and tradeoffs below are a reading guide, not a new feasibility study. Some entries are physical projects; others supply water, improve inflow or help pay for the work. They may need to be combined.
Choose the problem. Compare the approaches.
Filter by a goal, then select up to two approaches to compare. These are overlapping tools, not equal substitutes or a ranking of winners.
12 approaches and supporting measures
Your comparison
Work under way
Managed habitat ponds and wetlands
- The idea
- Keep selected areas wet and manage conditions for fish and birds.
- Potential benefit
- Can cover exposed ground while creating feeding and nesting habitat.
Tradeoffs, people and next steps
- Tradeoff
- Benefits have boundaries. Pumps, water supply, salinity management and long-term upkeep remain necessary.
- Who is involved
- SSMP, DWR, CDFW and local/federal partners; SCH is a major example.
- What would strengthen the case
- Look for functioning habitat and monitoring results, not just completed earthwork.
Work under way
Dry-land dust suppression
- The idea
- Stabilize emissive ground without trying to cover the whole lakebed with water.
- Potential benefit
- Surface roughening and vegetation offer tools where open-water habitat is impractical.
Tradeoffs, people and next steps
- Tradeoff
- Treatments need site-specific design and maintenance; they do not restore the lake’s fishery.
- Who is involved
- SSMP and land/water agencies implementing dust-control projects.
- What would strengthen the case
- Ask which acreage actually emits dust and how measured emissions change after treatment.
Long-range concepts
A smaller or partitioned lake
- The idea
- Concentrate the available water in managed lake areas.
- Potential benefit
- Could make a defined shoreline or habitat area more manageable than the entire historic footprint.
Tradeoffs, people and next steps
- Tradeoff
- The engineering question is whether barriers and water budgets remain workable through dry years; exposed areas still need treatment.
- Who is involved
- State planners, Bureau of Reclamation and Salton Sea Authority have developed different configurations.
- What would strengthen the case
- Compare the actual footprint, inflow assumptions and maintenance obligations.
Long-range concept
Direct existing inflow to useful places
- The idea
- Distribute inflow through habitat and dust-control areas before it reaches the residual lake.
- Potential benefit
- Targets a limited resource at places where it could do more than one job.
Tradeoffs, people and next steps
- Tradeoff
- Water used in one cell cannot simultaneously sustain every other cell. Salt and water accounting must cover the entire system.
- Who is involved
- Water Optimization concept associated with Michael Cohen of the Pacific Institute.
- What would strengthen the case
- Demonstrate a dependable supply and realistic downstream conditions.
Sources [3]
Reviewed alternatives
Desalination and water recycling at the Sea
- The idea
- Separate fresh water from saline lake water and manage the concentrated salt stream.
- Potential benefit
- Targets salinity directly instead of relying only on dilution.
Tradeoffs, people and next steps
- Tradeoff
- Removing salt takes energy and infrastructure; concentrated brine or solids need a permitted destination. Water losses need replacement.
- Who is involved
- The independent review panel considered lake desalination; Sephton Water Technology proposed Water Recycling.
- What would strengthen the case
- Test the feed-water chemistry, recovery rate, disposal plan and full operating cost.
Long-range concept
Pump salty water out
- The idea
- Create an engineered outlet for a lake that has no natural one.
- Potential benefit
- An export stream can carry salt out of the basin.
Tradeoffs, people and next steps
- Tradeoff
- It also exports water. Replacing that water and disposing of the receiving stream become central design questions.
- Who is involved
- Pump Out options appear in the state’s long-range inventory.
- What would strengthen the case
- Show the replacement supply, receiving-water safeguards and energy requirement.
Reviewed; not recommended in 2022
Import water from the Gulf of California
- The idea
- Bring ocean water—or water desalinated near the coast—north to the Salton Sea.
- Potential benefit
- A substantial external supply could support a larger water footprint.
Tradeoffs, people and next steps
- Tradeoff
- Raw seawater adds salt; desalinated imports add treatment and brine-disposal requirements. Cross-border approvals are only part of the challenge.
- Who is involved
- Past teams include Cordoba Corporation, Sephton Water Technology and New Water Group; EcoMedia Compass and the Salton Sea Coalition have advocated imports.
- What would strengthen the case
- A revised proposal needs independent, comparable cost and environmental review.
Reviewed alternative
Desalinate in Mexico, exchange for river water
- The idea
- Provide a replacement supply in Mexico while arranging a corresponding Colorado River delivery to the Sea.
- Potential benefit
- Separates where desalination occurs from where the restoration water is delivered.
Tradeoffs, people and next steps
- Tradeoff
- It requires a real agreement and enforceable water accounting; an exchange cannot create two allocations from the same water.
- Who is involved
- IRP Water Exchange concept; would require the relevant U.S., Mexican and water-agency participants.
- What would strengthen the case
- Identify consenting parties, a secured net supply and operating responsibilities.
Sources [4]
Recommended by the 2022 panel
Voluntary agricultural water transfers
- The idea
- Pay willing agricultural participants for water assigned to restoration, paired with lake desalination.
- Potential benefit
- Uses a regional water-delivery system; a 2020 study found leasing cheaper than ocean import under its assumptions.
Tradeoffs, people and next steps
- Tradeoff
- Compensation, farm-community effects, drought and competing Colorado River demands matter. Conserved water is not automatically assigned to the Sea.
- Who is involved
- Independent review panel; implementation would need growers, IID, the state and other rights holders.
- What would strengthen the case
- Verify a binding restoration allocation and the net gain after changed return flows.
Work under way
Improve tributary water quality
- The idea
- Reduce exposure to polluted inflow and improve the water entering the system.
- Potential benefit
- Addresses water quality and community exposure alongside habitat restoration.
Tradeoffs, people and next steps
- Tradeoff
- Cleaner inflow is valuable, but is not automatically additional water or a solution to accumulated salt.
- Who is involved
- New River Improvement partners include DWR, CNRA, the State Water Board and Salton Sea Authority.
- What would strengthen the case
- Distinguish a completed local project from river-wide water-quality outcomes.
Sources [11]
Supplemental concepts
Smaller experimental and ecological additions
- The idea
- Test targeted additions alongside a broader restoration system.
- Potential benefit
- Small pilots can answer a specific question before a large commitment.
Tradeoffs, people and next steps
- Tradeoff
- A promising component must still demonstrate benefits, water demand and ecological compatibility at scale.
- Who is involved
- The inventory includes AGESS’s Southlake concept, native-desert reclamation, floating solar/water generation and Save the Coachella Valley Basin.
- What would strengthen the case
- Require measured results; inclusion in a planning document is not proof of feasibility.
Sources [4]
Industry development; funding mechanism
Lithium development and restoration revenue
- The idea
- Use a share of lithium-extraction tax revenue to support restoration.
- Potential benefit
- Could add a funding stream and local economic activity if commercial production develops.
Tradeoffs, people and next steps
- Tradeoff
- Revenue depends on taxable extraction. Deep-brine mineral recovery does not itself refill the surface lake or remove its salt.
- Who is involved
- CEC, Imperial County, BHE/TerraLithium, EnergySource Minerals and Controlled Thermal Resources.
- What would strengthen the case
- Separate demonstration milestones, production targets and money actually collected.
Categories and tradeoff questions are DOI’s explanatory framework. Status descriptions refer to the specific records cited, checked October 18, 2026. “Work under way” does not mean the entire problem is solved.
Could water from Mexico refill the Salton Sea?
The body of water usually meant is the Gulf of California, also called the Sea of Cortez. Import proposals vary: an open canal is not the same project as a pipeline; raw seawater is not the same product as desalinated water; importing water alone is not the same system as importing water while exporting salt.
The public forums archived by EcoMedia Compass show how many teams have worked on these ideas, including the Sea to Sea Development Team, Cordoba, Sephton, New Water Group and others. Without the lecture’s date or presenter, I cannot identify which specific cost calculation I heard. [7]
The attraction is easy to understand: additional water could cover exposed land and sustain a larger lake. The complication is that the job does not end when water arrives. Ocean water contains salt. In an evaporating basin without a natural outlet, that salt requires its own management plan. Desalinating first moves part of the treatment and waste problem to the coast. [8]
Nor does being below sea level make an entire route a free gravity feed. The Pacific Institute’s route critique identifies intermediate elevation, pumping, energy, rights-of-way and cross-border negotiations among the issues. That is an argument about a complete system, not just the elevation of its endpoints. [8]
Was importing seawater the cheapest solution?
The evidence reviewed here does not establish that. A proponent may have calculated a lower price for a particular canal, route or technology. That calculation should be considered on its stated assumptions, then compared with alternatives delivering the same result over the same period.
In 2022, the independent panel supported by UC Santa Cruz evaluated import submissions and developed a composite Sea of Cortez import concept from three proposals. Its review found engineering possibility alongside high expense, environmental risks, a long delivery timetable and limited benefits to Mexico. It did not recommend proceeding with the submitted importation concepts. [2]
A separate peer-reviewed 2020 study by Lucia Levers, S. Drew Story and Kurt Schwabe found agricultural water leasing substantially cheaper than ocean imports under its assumptions. Neither that study nor a 2022 review supplies a current construction bid. They do show why “cheapest” needs more qualification than a single headline. [6]
What is in the state’s long-range inventory?
The 2024 Long-Range Plan contains 13 numbered concepts in addition to the Phase 1 program. The names below help readers recognize plans they may have heard at meetings; they are not 13 approved projects. [3] [4]
Open the 13-concept reference list
- North/South Marine Sea
- Divided Sea / Marine Sea South
- Updated Perimeter Lake
- Pump Out Options
- Water Optimization
- Southlake Restoration and Enhanced Vegetation
- Water Recycling
- Reclamation of Native Desert and Agriculture
- Floating Solar and Water Generation System
- Save the Coachella Valley Basin
- IRP Water Importation
- IRP Water Exchange
- IRP Colorado River Water Transfer
The plan contains variants. Several smaller concepts are considered potential components rather than complete restoration alternatives. Our comparison groups related tools so their different purposes are easier to see.
That distinction matters for ideas such as floating solar or small ecological pilots: the proper next question is what a measured trial demonstrates, not whether inclusion in a report amounts to endorsement.
Where does lithium fit—and where is it now?
Lithium is primarily an industry and potential funding story. The projects discussed here recover lithium from deep geothermal brine. They are not draining lithium out of the surface lake. California’s Energy Commission describes a tax-revenue allocation under which 20 percent supports Salton Sea restoration; the other 80 percent goes to producing counties, with an additional community allocation rule for Imperial County. [13]
That is a route to funding, not a guarantee of a particular amount or delivery date. The CEC’s Summer 2026 update says development has been slower than anticipated amid difficult lithium prices and financing conditions. [14]
BHE Renewables / TerraLithium
The October 1, 2026 update describes processing milestones and demonstration operations expected through 2027 before a future commercialization decision. That is progress, but not proof of sustained commercial output. [15]
EnergySource Minerals / ATLiS
The developer’s project page lists first delivery in the second half of 2028. Treat that as a company target, not an operating milestone already achieved. [16]
Controlled Thermal Resources / Hell’s Kitchen
Its October 1, 2026 update describes a power-first strategy: geothermal power targeted for 2028, followed by lithium in 2030. It also describes financing transactions subject to conditions. These are forward-looking plans. [17]
Our geothermal and lithium explainer shows how the process works. The practical restoration question is how much revenue is actually collected, what it funds and whether that funding lasts through operations and maintenance.
Cleaner water and dust control still matter
New River work illustrates why “supporting measure” does not mean unimportant. The Calexico project record lists construction completed and describes trash screening, a polluted-water bypass and treated-water return. It addresses a specific exposure and water-quality problem; it does not certify that the entire river or lake has been cleaned. [11]
Likewise, habitat ponds and dust treatments can help while bigger choices remain unsettled. SCH’s January 2026 record distinguishes 4,910 acres of constructed ponds from two filled ponds totaling 2,010 acres. That is why our restoration project guide separates plans, construction and functioning components. [9]
Playa is also only one contributor to regional air pollution. A cleaner future cannot be evaluated solely by the lake’s level, and controlling a dust source does not establish that every air-quality problem has disappeared. [18]
What could actually happen next?
In March 2026, the Army Corps described its study as evaluating 12 alternatives drawn from the long-range work, another Corps-developed proposal and a no-action alternative. Partners include DWR and the Salton Sea Authority. Its criteria include effectiveness, completeness, efficiency, acceptability, timing of ecological benefits and maintenance requirements. [5]
The records reviewed here do not establish a final, funded lakewide winner. A feasibility study can recommend a path toward construction; it is not itself the construction. Meanwhile, the current habitat and dust program continues. [5] [10]
My reading is that a combination deserves more attention than a single miracle: immediate dust and habitat work, explicit decisions about water and salt, cleaner inflows, demonstrated technology and dependable funding. That is an interpretation of the different jobs, not a claim that agencies have selected this exact package.
The next persuasive announcement should make clear what changed: a signed water agreement, a completed permit, a funded contract, operating results or independently reviewed costs. Those are stronger signals than a new rendering or another projected opening date.
Explore the Salton Sea guide, follow where its water goes, or plan a visit to the North Shore Beach and Yacht Club, State Recreation Area and Sonny Bono refuge. These places reveal different sides of the same question.
Questions about Salton Sea solutions
Is importing water from Mexico an approved Salton Sea restoration project?
The reviewed sources do not establish an approved, fully funded import system. The 2022 independent panel did not recommend proceeding with the submitted importation concepts. The state’s long-range inventory preserves concepts for comparison; that is different from authorization to build.
Would seawater alone fix the Salton Sea?
It could add water, but it also imports salt. A durable design must account for continuing evaporation, inflow and salt removal or isolation. Desalinated imports require treatment and a destination for the concentrated waste stream.
Will lithium extraction refill or clean the lake?
The major projects target deep geothermal brine, not the surface lake. They could help fund restoration through extraction-tax revenue if taxable production develops. Their physical process is not a lake-refilling or lake-desalination project.
Why not send all conserved farm water to the Sea?
Conservation does not determine where saved water goes. Rights, contracts and program purposes govern its destination. Some current conservation supports the Colorado River system. A restoration transfer needs a specific allocation and accounting for reduced agricultural return flows.
Which solution is definitely the cheapest?
There is no universal answer without defining the outcome, time horizon and full cost. A 2020 study favored agricultural leasing over ocean imports under its assumptions; that is not a 2026 bid or a comparison of every possible restoration benefit.
Sources and reporting notes
Research checked October 18, 2026. Dates below belong to the underlying records. Developer targets and advocacy claims are identified as such. This comparison is not an engineering feasibility study and is not exhaustive of every historical suggestion.
- State Water Resources Control Board — Salton Sea Management Program. Current program overview and long-range planning links; checked October 18, 2026.
- UC Santa Cruz — Independent review findings. October 19, 2022. Review of importation and smaller-Sea alternatives; recommendations are not construction approvals.
- California Natural Resources Agency / SSMP — Final Long-Range Plan. April 2024, revision 1.01. Thirteen numbered concepts, with variants. Indexed sections and executive summary reviewed; the full PDF download was unavailable during this update.
- SSMP — Long-Range Plan executive summary. Accessible executive-summary edition of the 2024 plan, posted in 2025. Concept inventory; not a selected construction plan.
- U.S. Army Corps of Engineers — Feasibility study progress. March 11, 2026. Study partners, alternatives and screening criteria.
- Lucia Levers, S. Drew Story and Kurt Schwabe — Boons or boondoggles: An assessment of the Salton Sea water importation options. California Agriculture, 2020. Peer-reviewed comparison of ocean imports and agricultural water leasing; historical assumptions, not 2026 bids.
- The EcoMedia Compass — Water import proposals and public forums. Advocacy source with named teams and links to 2018/2021 proposals and 2021/2022 forums; checked October 18, 2026.
- Pacific Institute — Salton Sea import/export plans. Technical critique of import/export systems; used for salt, routing and energy issues, not its older lake measurements or cost estimates.
- SSMP Project Tracker — Species Conservation Habitat. Project record last updated January 29, 2026; checked October 18, 2026. Separates pond construction and filled acreage.
- California Legislative Analyst’s Office — The 2024–25 Budget: Salton Sea Management Program. February 26, 2024. Near-term habitat/dust work, limits and continuing funding needs.
- SSMP Project Tracker — New River Improvement. Record updated January 13, 2026: Calexico reach construction completed; not a claim that the whole river is clean.
- Imperial Irrigation District — Additional Colorado River system support in 2026. 2026 conservation announcement. Water conserved for the Colorado River system must not be described as an allocation to the Salton Sea.
- California Energy Commission — Lithium Valley Vision. Lithium extraction and 80/20 tax-revenue allocation; checked October 18, 2026.
- California Energy Commission — Lithium Valley Update, Summer 2026. Summer 2026 update, posted October 2026. Describes slower progress and market/financing challenges.
- BHE Renewables / TerraLithium — Community update on Imperial Valley lithium development. October 1, 2026. Demonstration operations expected through 2027 ahead of a future commercialization decision.
- EnergySource Minerals — Project ATLiS. Developer page checked October 18, 2026. Lists second-half 2028 first delivery target; not verified production.
- Controlled Thermal Resources — Power-first development and capital structure update. October 1, 2026. Developer targets power in 2028 and lithium in 2030; proposed financing transactions remain conditional.
- Pacific Institute — Breathing Hazard: Air Pollution in the Salton Sea Region. 2025 research. Playa dust is one part of the region’s broader air-pollution burden.