Rancho Mirage Highway 111 Plan and Progress Tracker
A map-led guide to the three-mile corridor, the November council vote and the sites where future development could take shape.
Stand at Highway 111 and Bob Hope Drive and you can see two shopping centers across one intersection. A few minutes west, near Mirage Cove Drive, the question facing the city is quite different: what belongs on an open site against the foothills? Rancho Mirage’s Highway 111 Specific Plan addresses both places. Follow the aerials below to see what the November vote means for each.
- Council advanced the plan on November 19. Final ordinance effectiveness remains to be verified.
- Twelve planning areas cover about 472 acres between Cathedral City and Palm Desert.
- Each property has its own timeline. The next milestones are ordinance adoption, site applications and funded improvements.
Explore the Highway 111 corridor
Start with the full corridor, then zoom to a planning area. Use the street view to find an intersection or switch to satellite to see how the site fits between the highway, neighborhoods and foothills.
The city’s aerial maps and all twelve planning areas are described below. View the city exhibits.
Open the city’s annotated aerial maps
These are details from the November council packet. Purple indicates mixed use. For the full land-use legend, open the original exhibit.



What did Rancho Mirage approve?
A specific plan spells out which uses a property can accommodate and how a future proposal will be reviewed. Rancho Mirage had separate west and east plans dating to 1989 and 1990. The update brings the corridor under one set of rules while giving each of its 12 areas its own priorities.
- October 22, 2026. The Planning Commission recommended that the City Council move the plan forward.
- November 19. The council advanced the plan. Item 6B called for environmental findings, General Plan and zoning-map amendments, and the first reading of the implementing ordinance.
- November 20. The city filed its Notice of Determination, which records November 19 as the project approval date.
Record checked November 26. The packet specifies that the ordinance takes effect 30 days after adoption. A final reading and effective date have yet to be verified for this tracker. An owner seeking to build still has to bring forward a proposal for the property.
Where the 862-home figure comes from
The city’s inventory counts about 430 existing homes and 1.82 million square feet of commercial space. Its land-use model estimates capacity for another 862 homes and 895,367 square feet of commercial space. Of those potential homes, 721 come from the mixed-use calculation. That is why the housing number is so sensitive to what owners eventually propose for those sites.
At full modeled buildout the totals would be about 1,292 homes and 2.72 million square feet of commercial space. Financing, lot assembly, infrastructure and demand all affect how much gets built. The city identifies no single construction or completion date for the corridor.
The twelve planning areas, west to east
West Gateway, Bighorn Cove, Peterson Road and Thunder Road. Rancho Cove and Bighorn Cove offer larger sites for coordinated development. Peterson Road is largely built out, so access, landscaping and filling smaller gaps matter more there. Thunder Road is where the housing overlay comes into play.
Central Corridor, Library Commons, Five Peaks and San Jacinto Arts District. These areas connect neighborhoods with the library, foothill sites and Community Park. Look for differences block by block: a sidewalk connection at the library and a privately developed site at Five Peaks would follow different paths.
Magnesia Falls South, The River, Las Palmas and East Gateway. Established businesses anchor this end. Reinvestment can mean shade in a parking lot, a better walking route or a new use in an existing building. Farther east, the plan recognizes the concentration of furnishings, design businesses and medical offices near Palm Desert.
The next evidence to watch for
The next corridor-wide milestone is the final ordinance and its effective date. After that, progress will be easiest to document by address: an application with a site plan, a funded city improvement, an issued permit, and eventually dated photographs of work on the ground. A restaurant opening or an older entitlement along Highway 111 can have its own history; the application date helps establish whether it predates this vote.
Highway 111 questions
Is construction about to begin along all of Highway 111?
The council action concerns land use. Individual sites can advance on different schedules, and no corridor-wide construction start has been identified.
Where does the plan apply?
It covers about 472 acres along roughly three miles of Highway 111 through Rancho Mirage, from the Cathedral City side to the Palm Desert side. The overview aerial shows the boundary.
Are 862 homes approved for construction?
The figure estimates capacity under the land-use assumptions. A specific housing proposal would identify parcels, an applicant and an actual unit count.
Is the Bighorn Cove illustration a final design?
The city uses it to show how several uses could fit together. A developer would need to submit a specific design for review.
Does this include Disney’s Cotino project?
Cotino has its own development approvals, location and milestones. DOI follows the community and its public waterfront in a separate Cotino tracker.
Sources and map credits
- City Council packet, November 19, 2026, item 6B. Staff report, first reading and draft ordinance.
- Specific Plan land-use inventory and aerial exhibits. Table I-1 and Exhibits I-4 and I-5. Overview from Attachment 1. City of Rancho Mirage, Terra Nova Planning and Esri. Geographic annotations by Desert Oasis Insider. Imagery acquisition dates were not supplied.
- Final environmental review, filed November 10, 2026.
- Notice of Determination, filed November 20, 2026.
































